Navy Pier Renovation
The outer end of the trestle suffered major damage from hurricane harvey and required a pre design survey and analysis of the scope of work area to validate existing conditions.
Navy pier renovation. Nearing its 100th anniversary in 2016 the pier is undertaking a major planned renovation. Navy pier renovation corpus christi tx sames was subcontracted by tikigaq construction to perform design build services for renovation of a pier located at the naval air station in corpus christi. The scope of work included renovations to the south dock south arcade family pavilion and polk bros park. The first phase of the project includes the interior renovation of the first and second floor public spaces retail and food court spaces of the family pavilion a space that is considered an essential income generator for the pier.
Navy pier s dynamic lakefront location has been a part of chicago s history since 1916. Npi issued its centennial vision in june of 2011 a framework plan that outlined npi s long term vision that would guide the redevelopment of the pier. View the reimagination through renderings and then see the renderings come to life in each photograph. Navy pier is illinois number one tourist attraction.
Part of the south arcade renovation included a new. Renderings images renderings images.